Springfield VA Clinic

Pitt Technology Group was privileged to be selected as the primary Low Voltage contractor on this project. From the pre-construction redline drawing to post construction testing, and certification. Pitt Technology provided and performed a turn key integrated technology installation for multiple building systems.

  • Installation of 2500 Individual Runs of Cat6.
  • Installation of over 500k feet or 96 miles of cable
  • Installation of a fiber backbone for all IDF & MDF locations capable of 100’s of Gigabit throughput.
  • Installation of a Enterprise Class Wireless System with over 80 individual Access Points with a Air-Gapped Guest network.
  • Installation of Racks, Cable Tray and Cable Managers